GE Aerospace Continues to Urge USAF to Procure New Powerplant for F-35 Written 22 February 2023

F35A-Engine-Burn-2019

An F-35A demonstration flight at the 2019 Australian International Airshow in Avalon, Victoria | Credit: Bidgee; Wikipedia; CC BY-SA 3.0

FlightGlobal reports, “GE Aerospace is continuing to press the US Air Force (USAF) to procure a new powerplant for Lockheed Martin’s F-35 fifth-generation fighter, rather than opting to perform core upgrades on the existing F-35 powerplant.” GE Aerospace claims that its XA100 adaptive-cycle engine, built for the F-35 under the USAF’s Adaptive Engine Transition Program, provides “transformational benefits” in range, thrust, acceleration and fuel consumption. GE Edison Works General Manager David Tweedie said on February 16, “We really think AETP clearly is the solution. And we are ready to meet that challenge and continue to move forward.” According to FlightGlobal, this “push comes ahead of the expected release in March of President Joe Biden’s fiscal year 2024 budget proposal – a document that could reveal the Pentagon’s plans for addressing shortfalls with the F-35’s existing, P&W-made F135 powerplant.”
More Info (FlightGlobal)